ISO 10tpd 20tpd 30tpd 50tpd 100tpd 200tpd Complete Automatice Rice Mill Machine
Product Description Rice Milling process: 1. Cleaning part Bucket Elevator is mainly used to transport paddy rice in com
Send your inquiryDESCRIPTION
Basic Info.
Model NO. | YBDM |
Transport Package | Container by Sea Shipping |
Specification | 5ton per day to 500 ton per day |
Trademark | Yubei |
Origin | China |
HS Code | 8437800000 |
Production Capacity | 20 Sets Per Month |
Product Description
Product Description
Rice Milling process:
1. Cleaning part
Bucket Elevator is mainly used to transport paddy rice in complete processing line.
The screening and de-stoner machine is used for cleaning the grains,removing impurities like sand,cinders,mud,dust,shell etc.
2. Milling part
Next, the rice into the paddy husker to remove the shell.
It can separate the shell from the paddy husk mixture through the suction effect.
Paddy separating screen used to separate the brown rice and rice.
The rice that has removed the shell will be into the emery roller milling machine for further processing.
Then into the color sorter to select the super white rice and broken rice.
3. Packing partFinally,use automatic packing scale to pack the white rice .Features:1.Beauty installation structure2.Out rate of rice guarantee3.Less Worker labor4.High efficient
Rice Milling Machine Specifications | |||||||||
Type | 5T | 10T | 20T | 30T | 50T | ||||
Capacity(T/D) | 5 | 10 | 20 | 30 | 50 | ||||
Power(KW) | 20 | 57 | 72 | 97.4 | 143.19 | ||||
Installation | 5*3*3.2 | 10*5*4.5 | 11*5*4.5 | 12*5*5.5 | 18*6*5.5 |
Type | 80T | 100T | 200T | 300T | 500T |
Capacity(T/D) | 5 | 10 | 20 | 30 | 50 |
Power(KW) | 20 | 57 | 72 | 97.4 | 143.19 |
Installation | 26*6*6 | 35*8*8 | 36*8.5*11 | 45*8.5*11 | ( 38*8.5*11)X2 |
Product Show
Certification
Our Service
Pre-Sale | Win-win cooperation: 1. Sign the contract 2. Establish mutual benefit, strategic cooperative partnership. | |
In-Sale | Design evaluation: Design of process and equipment layout Installation: 1. Quality and quantity guaranteed 2. Completion of hand over Acceptance: Acceptance test | Technical training: 1.On-site installation and products training2.Operation skills training 3.Maintenance training 4.Centralized technical training. |
After-ale | Engineers available to service machinery overseas Technical service: Long time technical service Master device: Free supply during warranty period. Accessories supplying: Supplying spare parts with cost. |
Our Factory
Workshop & Warehouse
Guests Visit FAQ
Related Products